Tuesday, 22 November 2011

Production scheduel

Below is our production log. This states where, when and what problems and how we over came them during the shooting time span that we had. We had many problems however have been able to over come them and have stated what we done.
We found when picking our final clips then editing them before the others where shot saved us alot of time and effort so it didnt take aslong as what had been predicted. However this was a massive gamble and could of proved us wrong setting us back time and doubling our work load so we had more time to consider angles and lighting and other effects we can put into the trailer itself.

No comments:

Post a Comment